Saviour Impex infrastructure products and bridge engineering

5 product ranges Pakistan & China product sourcing Since 2018 documented project experience

Bridge services

Bridge lifting and
bearing replacement

Saviour Impex supports bridge owners, consultants, and contractors with bridge rehabilitation and bearing-related work.

  • Bridge lifting

    Controlled hydraulic lifting to access existing bearings during bridge rehabilitation.

  • Bearing pad replacement

    Removal of existing pads and installation of replacements to the project specification.

  • Bearing rectification

    Correction of bearing alignment, seating, and associated plinth conditions as required.

View our methodology
Jacking equipment set beneath concrete bridge girders
On-site bridge bearing work

Methodology

How we approach bearing replacement

The scope and lifting sequence depend on the bridge and the project requirements.

01 Site assessment and planning

Review the structure, bearing positions and access to establish a project-specific lifting plan.

02 Work-area preparation

Prepare the bearing seat, plinth and surrounding work area for access.

03 Jacking system setup

Set up hydraulic jacks and monitoring equipment in the positions specified by the lifting plan.

04 Controlled lifting and monitoring

Lift the span in a controlled sequence while monitoring its level and movement.

05 Replacement and rectification

Remove the existing pads, prepare the seat as required, and position the new bearings.

06 Lowering and handover

Lower the structure in a controlled sequence, check seating, and clear the work area.

Selected projects

Project experience across Pakistan

Bridge lifting, bearing work, and pad supply for road and transit infrastructure.

  • 2018

    Lahore–Sialkot Motorway

    Bridge lifting and bearing pad rectification

    NHA · Zeeruk · FWO
  • 2020

    Bridge No. 04, M-9

    Replacement of existing bearing pads

    NHA · NESPAK · FWO
  • 2021

    Timergara–Khar–Mohmand Ghat Road

    Bearing pad replacement at Bridges 1–5

    PKHA · Pavron · FWO 121 QCB
  • 2023

    Derya Khan Bridge, River Indus

    Supply and replacement of bearing pads

    PKHA · NESPAK
  • 2024

    Imamia Colony Railway Crossing, Shahdara

    Bearing pad rectification

    NHA · NESPAK · NLC
  • 2024

    Mandra Bridge, Chashma Road, D.I. Khan

    Bearing pad rectification

    PKHA · NESPAK
  • 2024–2025

    Rawalpindi Ring Road

    Bearing pad supply for multiple packages

    FWO
  • 2025

    Liaqat Bagh Metro Bus System, Rawalpindi

    Bearing pad rectification

    PMA · NESPAK

Downloads

Product catalogues

Download the original brochures for product models, configurations, and specifications.

Contact Saviour Impex

Discuss your project

For pricing, availability, or a bridge services enquiry, share the project location, drawings or specifications, and quantities where available.

Lahore head office

25-B, XX Block, Khayaban-e-Iqbal
Phase III, D.H.A., Lahore, Pakistan